Cleaning the conveyor section

Interval

  • all 100 Operating hours

    or

    At the end of the season

  1. Loosen the 4 knurled screws 4.
  2. Remove the cover 1.
  3. To remove the deposits,

    aim a water jet into the seed outlets 3 and into the corrugated tube 2.
  4. Install the cover.
  5. Tighten the 4 knurled screws by hand.