Jump to main content
myAMAZONE
OP. MAN. CATAYA 3000/4000 SUPER
Search
Index
Preparing the implement
Back
Calculating the required tractor characteristics
Coupling the implement
Preparing the implement for use
Adjusting the working position sensor
Operating the hopper cover
Adjusting the fill level sensor
Attaching the seed guide elements
Filling the hopper
Adjusting the placement depth on the TwinTeC coulter
Adjusting the placement depth on the RoTeC coulter
Manual coulter pressure adjustment
Hydraulic coulter pressure adjustment
Adjusting the coulter harrow
Adjusting the exact following harrow
Adjusting the roller harrow
Adjusting the tramlines
Operating one-sided switching
Operating the loading board steps
Preparing the metering unit for operation
Preparing the implement for road travel
Calculating the permissible payload
OP. MAN. CATAYA 3000/4000 SUPER
Preparing the implement
Preparing the implement for use
Preparing the implement for use
Adjusting the working position sensor
Operating the hopper cover
Adjusting the fill level sensor
Attaching the seed guide elements
Filling the hopper
Adjusting the placement depth on the TwinTeC coulter
Adjusting the placement depth on the RoTeC coulter
Manual coulter pressure adjustment
Hydraulic coulter pressure adjustment
Adjusting the coulter harrow
Adjusting the harrow angle
Deactivating the coulter harrow
Adjusting the harrow height
Adjusting the exact following harrow
Bringing the exact following harrow or seed harrow into working position
Adjusting the position of the exact following harrow tines
Manual pressure adjustment of the exact following harrow
Hydraulic adjustment of the exact following harrow pressure
Lifting out the exact following harrow
Adjusting the roller harrow
Adjusting the pitch of the roller harrow tines
Adjusting the working depth of the roller harrow tines
Adjusting roller contact pressure
Lifting out the roller harrow
Adjusting the tramlines
Adjusting the tramline marker
Mounting the tramline metering wheel
Operating one-sided switching
Operating the loading board steps
Preparing the metering unit for operation
Selecting setting values
Mounting bean metering wheels
Adjusting the bottom flap
Adjusting the sliding shutters
Adjusting the agitator shaft support
Calibrating the metering unit