Jump to main content
myAMAZONE
Operating Manual - Tyrok 400, 400 V
Search
Index
Preparing the machine
Back
Preparing for initial operation
Coupling the implement
Preparing the implement for operation
Preparing the machine for road travel
Operating Manual - Tyrok 400, 400 V
Preparing the machine
Preparing the machine
Preparing for initial operation
Installing or removing the beam extension
Calculating the required tractor characteristics
Preparing the tractor
Removing the protective varnish
Activating the central overload safety
Adjusting the setting range of the front furrow width to the tractor inner track width
Coupling the implement
Removing the safety device against unauthorised use
Preparing the headstock
Coupling the lower link
Coupling the top link
Coupling the hydraulic hose lines
Coupling the lighting for road travel
Coupling the power supply for the electro hydraulic working depth adjustment
Moving the parking supports into parking position
Lifting the parking support
Swivelling the plough body into transport position
Installing the rear lighting
Preparing the implement for operation
Manual adjustment of the working width of the plough bodies
Manual adjustment of the plough body working depth
Preparing the disc coulter for operation
Preparing the skimmers for operation
Setting the tripping force for the central overload safety
Adjusting the tripping force of the decentralised overload safety
Adjusting traction assistance
Adjusting the packer arm with packer catch hooks
Preparing the machine for road travel
Checking the pre-tension of the overload safety
Moving the packer arm into transport position
Removing the subsoiler point
Moving the implement in the transport position
Switching on the running gear spring suspension
Installing the rear lighting
Move front identification into transport position
Removing the subsoiler point
Locking the tractor control units