Checking the central lubrication
Interval
Daily
- Check the fill level in the reservoir.
If the fill level in the reservoir 1 is low:
fill in grease through the filling nipple 3 until just below the MAX mark.- Check the pressure relief valve 2 to determine whether grease escapes.
Grease emerging at the pressure relief valve indicates a blockage on the lubrication points.
Depending on the equipment, the central lubrication system consists of several distributors that are connected to each other.
To eliminate blockages:
Pump in the grease through the grease nipple 1 on the last distributor as seen from the pump.- Check for grease emerging from the lubrication points belonging to the distributor.
If no grease emerges from a lubrication point:
remove the grease nipple from the faulty lubrication point and clean it.- Clean faulty lubrication points.
- Reinstall the grease nipple on the faulty lubrication point.
- Pump in grease again through the grease nipple 1.
- Check the cleaned lubrication points for emerging grease.
- Repeat the procedure on all of the distributors.
When all of the faulty lubrication points have been cleaned, the central lubrication system can be tested over a longer period of time as follows:
- Set the blue rotary knob on the pump at 3 and the red rotary knob at 9.
- Supply the central lubrication system with power for 12 hours.
If grease emerges on the pump after 12 hours:
Repeat the procedure as described.
