Maintaining the machine
After initial operation
Checking and adjusting the scraper on the roller
Checking the hydraulic hose lines
As required
Aligning the disc gangs relative to each other
Checking the hoses on the slurry spreader
Replacing the cutting ring and cutting blade in the slurry spreader
Replacing the seals on the distributor head of the slurry spreader
Daily
all 100 Operating hours
all 200 Operating hours / Every 3 months
all 50 Operating hours / Weekly
Checking the hydraulic hose lines
Checking the cutting ring and cutting blade in the slurry spreader
