Jump to main content
myAMAZONE
Operating Manual - Cenio 3000, 3500
Search
Index
Preparing the machine
Back
Calculating the required tractor characteristics
Coupling the implement
Preparing the implement for operation
Preparing the machine for road travel
Operating Manual - Cenio 3000, 3500
Preparing the machine
Preparing the machine
Calculating the required tractor characteristics
Coupling the implement
Adjusting the three-point mounting frame
Attaching the backstop profiles for the lower links
Attaching the ball sleeve for the top link
Driving the tractor towards the implement
Coupling the hydraulic hose lines
Coupling the lighting for road travel
Coupling the three-point mounting frame
Aligning the implement horizontally
Preparing the implement for operation
Adjusting the working depth of the coulters
Adjusting the wing share
Adjusting the working depth of the levelling
Preparing the spring steel closer for operation
Preparing the edge levelling discs for operation
Adjusting the scraper on the roller
Adjusting the trailing elements
Removing the road safety bars
Filling the GreenDrill
Preparing the machine for road travel
Preparing the side elements for road travel
Moving the harrow into transport position
Putting on the road safety bars
Reducing the implement width to the permitted transport width
Locking the tractor control units