Configuring pre-metering

To ensure that all products are spread at one point, regardless of the length of the conveyor section, the metering units can be pre-metered for each hopper. The time for the duration of the pre-metering must be specified.

NOTE
The duration of the pre-metering does not affect Section Control. The times for Section Control are set separately.
  1. In the Settings menu, select Implement > Metering unit.
NOTE

If the time for pre-metering is incorrectly set, overlaps or gaps in the seed can occur. This can also happen when starting up too fast or too slowly.

  1. Enter the duration of the pre-metering for the desired hopper.