Installing the seed guide elements
Depending on the implement version, 4 or 6 seed guide elements 1 are required for the hopper.
- Open the hopper cover.
- Release the locking mechanism 2 for the charging sieve with the universal operating tool 1.
- Fold up the charging sieve 1.
- Position the seed guide elements 1 in the hopper.
- Fold down the charging sieve 1.
- close the hopper cover.
