Lifting the implement

REQUIREMENTS

  • The lighting system is clean and in perfect technical condition

  • Track markers are folded in

  1. Lift the implement with the 3-point power lift of the tractor.
  2. Check the connections of the hydraulic lines and the power supply.
  3. Switch off control terminal.
  4. Switch off the work lights.
  5. Lock the tractor control units.