Cleaning the filling auger

Interval

  • all 100 Operating hours

    or

    Every 12 months

REQUIREMENTS

  • The implement is coupled to the tractor

  • The fan is switched off

  • The filling auger is switched off

  • The tractor and implement are secured

  1. Place a collection bucket 1 under the conveyor tube.
  2. Loosen the nuts 3 and remove them.
  3. Remove the cover 2.
  4. Knock out the fertiliser residue from the conveyor tube and collect it.

WORKSHOP WORK

  1. Unscrew and remove the bolts 1.
  2. Remove the installation flap 2.
  3. Thoroughly clean the filling auger 3 with a water jet.
  4. Put on the installation flap.
  5. Put on the bolts and tighten them.
  6. Install the cover.
  7. Put on the nuts and tighten them.