Cleaning the filling auger
Interval
or
Every 12 months
REQUIREMENTS
The implement is coupled to the tractor
The fan is switched off
The filling auger is switched off
The tractor and implement are secured
- Place a collection bucket 1 under the conveyor tube.
- Loosen the nuts 3 and remove them.
- Remove the cover 2.
- Knock out the fertiliser residue from the conveyor tube and collect it.
WORKSHOP WORK
- Unscrew and remove the bolts 1.
- Remove the installation flap 2.
- Thoroughly clean the filling auger 3 with a water jet.
- Put on the installation flap.
- Put on the bolts and tighten them.
- Install the cover.
- Put on the nuts and tighten them.
