Lubricating the roller chain on the central fertiliser metering drive

Interval

  • all 50 Operating hours

    or

    At the end of the season

  1. Remove the bolts 1.
  2. Remove the cover 2.
  1. Lubricate the roller chain 1 from the inside going out.
  2. Check chain tensioner 2 for ease of movement.
  3. Install the cover.
  4. Install the bolts.