Establishing the air supply and fertiliser supply on the distributor head

Distributor head connection

Conversion from 8 to 12 rows

Conversion from 4 to 6 rows

Setting motor

Coulter row

Setting motor

Coulter row

1

A

1

A

1

2

B

2

Dust cap

X

3

C

3

B

2

4

D

4

Dust cap

X

5

E

5

C

3

6

F

6

Dust cap

X

7

G

7

D

4

8

H

8

Dust cap

X

9

I

9

E

5

10

J

10

Dust cap

X

11

K

11

F

6

12

L

12

Dust cap

X

REQUIREMENTS

  • Machine is lowered

  • The tractor and machine are secured

  • Firm and level hall floor

  1. To safely reach the distributor head:

    Use a suitable external ascent.
  2. Connect the connection cable for the setting motors to the wiring harness according to the table.
  3. Seal the free cables of the wiring harness with dust caps.
  4. Seal the free cables of the setting motors with dust caps.
  1. Connect the conveyor hoses to the distributor head as specified in the table.
  2. To ensure optimal hose routing:

    Refer to the table above for the rows that must be installed.
  3. For distributor heads without single-row control:

    Push the lever 1 upwards.
  1. Connect the conveyor hoses to the distributor head as specified in the table.
  2. For distributor heads and single-row control:

    Unscrew the bolt 1 until the lever can move freely.
  1. Actuate the coupling rod 2.
  2. Connect the conveyor hoses 1 to the distributor head as specified in the table.
  1. Install the conveyor hose 1 on the fertiliser coulter 3.
  2. Install the clamp 2.
  1. Install the air supply 2 on the air distributor.
  2. Install the clamp 1.