Establishing the energy supply

REQUIREMENTS

  • The machine is lifted

  • Secure the tractor against unauthorised operation

  • Firm and level hall floor

  • ISOBUS is disconnected from the tractor

  1. Disconnect the bridge plug 3 from the machine wiring harness 2.
  2. Take the cap 4 off of the coulter wiring harness 1.
  3. Connect the coulter wiring harness to the machine wiring harness.
  4. Seal the bridge plug with the cap. Store in a suitable place.