Jump to main content
myAMAZONE
Operating Manual - Precea 9000, 12000; -T, -TCC
Search
Index
Preparing the implement
Back
Checking the tractor suitability
Coupling the implement
Preparing the implement for operation
Installing the battery
Aligning the implement horizontally
Preparing the implement sections for rigid operation
Preparing the metering unit for operation
Repositioning the fill level sensor
Using the loading board
Extending and retracting the ladder
Opening and closing the hopper cover
Setting up the speed sensor on the implement
Filling the hand wash tank
Preparing the tractor wheel mark eradicator corrugated discs for operation
Preparing the micropellet spreader for operation
Determining the seed settings
Adjusting the Central Seed Supply system
Adjusting the air supply to the fertiliser metering unit
Adjusting the singling pressure with the tractor control unit
Adjusting the singling pressure with the slide-on pump
Adjusting the target pressure difference for the Central Seed Supply and fertiliser
Adjusting the shifted tramline
Adjusting the placement depth on the coupled fertiliser coulter
Adjusting the PreTeC mulch seeding coulter
Adjusting the grain singling unit
Adjusting the pressure of the implement sections
Adjusting the spread rate for seed
Manually calculating the grain spacing
Adjusting the electrically driven grain singling unit
Adjusting the spread rate
Determining the working speed
Adjusting the spread rate for fertiliser
Preparing FertiSpot for operation
Adjusting the track width
Preparing the machine for road travel
Operating Manual - Precea 9000, 12000; -T, -TCC
Preparing the implement
Preparing the implement for operation
Adjusting the spread rate for seed
Adjusting the electrically driven grain singling unit
Adjusting the electrically driven grain singling unit
Adjusting the spread rate
Determining the working speed