Putting the metering unit into operation
If the hopper is full:
Pull the sliding shutter 2 out of the metering housing.- Park the sliding shutter on the metering housing.
- Swivel the bolts 1 in front of the sliding shutter.
- Tighten the bolts with the wrench 3.
If work is started without calibration:
Close the calibration flap 2.- Lock the locking lever 1 on the metering housing.
Depending on the implement equipment:
Close the calibration flap on the second conveyor section 3.