Filling the fertilizer hopper with the filling auger
NOTE
PREREQUISITES
Implement coupled on the tractor
Tractor and implement are secured
The transport vehicle carrying the fertilizer is on a level surface
- Switch on the interior lighting of the hopper when working at night.
- Open the cover tarpaulin 1 of the filling funnel.
- Swing out the filling chute 2.
- Remove residues or foreign objects from the filling funnel.
To activate the oil supply of the feed auger:
Switch on tractor control unit beige with 8,45 gpm (32l/min).
- Slowly switch on the filling auger drive on the stop tap 1.
- Fill the filling funnel of the filling auger with the spreading material.
The fill level in the fertilizer hopper increases.
NOTE
The maximum filling capacity is reached when a material cone forms above the feed auger. If possible, let the fertilizer run directly into the filling funnel.
- Monitor the fill level through the inspection window.
When the fill level rises beyond the edge of the inspection window:
Reduce the filling of the filling hopper and the auger speed with the ball valve 2.When the fertilizer hopper is filled:
Stop filling the filling funnel.- Allow the feed auger to keep running until it is emptied.
- Via the stop tap, slowly switch off the drive of the filling auger.
- Switch off the tractor control unit.
- Swing in in the filling chute.
- Close the cover tarp of the filling funnel.
