Adjusting the placement depth on the leaf-spring guided fertilizer coulter
NOTE

The bolt 2 provides orientation on the scale 1.
PREREQUISITES
Machine must be on the solid floor of an equipment building.
- Lift out the machine.
For row widths less than 27,56 in (70cm)
Secure the machine.Keep the fertilizer coulter 1 in the set position.
Unscrew bolts 2.- Bring the fertilizer coulter into the desired position.
Keep the fertilizer coulter in the desired position.
Tighten bolts.- Apply the adjustment for all fertilizer coulters.
or
Bring the fertilizer placement depth in the tracks to the desired position.
