Cleaning the filling auger

Interval

  • Drain 100 operating hours

    or

    Every 12 months

PREREQUISITES

  • Implement is coupled on the tractor

  • Fan is switched off

  • Filling auger is switched off

  • Tractor and implement are secured

  1. Place a collection container 1 under the conveyor tube.
  2. Loosen the nuts 3 and remove them.
  3. Remove the cover 2.
  4. Knock out the fertilizer residue from the conveyor tube and collect it.

WORKSHOP TASK

  1. Unscrew and remove the bolts 1.
  2. Remove the installation flap 2.
  3. Thoroughly clean the filling auger 3 with a water jet.
  4. Mount the installation flap.
  5. Fit the bolts and tighten them.
  6. Mount the cover.
  7. Fit the nuts and tighten them.