Adjusting the micropellet metering unit bottom flap

Interval

  • Drain 100 operating hours

    or

    Every 12 months

  1. Bring the bottom flap lever 3 into working position.

The bolt head 1 must be 0,35 in (9mm) to 0,39 in (10mm) above the clamp lever 2.

  1. Check the preload. Adjust if necessary.