Disconnecting the hydraulic supply
REQUIREMENTS
The machine is lifted
Secure the tractor against unauthorised operation
Firm and level hall floor
Direct people out of the danger zone
To set the coulter pressure to zero:
Refer to the ISOBUS operating manual, Adjusting the coulter pressure.- Switch off the fan.
- Lower the machine. Move the 3-point hydraulic system of tractor into float position.
The coulter pressure cylinders are retracted.
The coulter pressure is relieved.
- Secure the tractor and machine.
Remove the bolt 2.
Remove the fastener 1.
- Open the valve 3.
- Repeat steps 5 to 7 on the opposite side of the machine.
To completely retract the coulter pressure cylinder:
Lift the machine again.To fix the coulter pressure cylinder for removal:
Lash the top link 1 and the lower link 3 with a tension belt 2.
NOTE
ENVIRONMENTAL INFORMATION
- Remove the coulter pressure supply 2 on the coulter to be removed.
- Remove the coulter pressure supply 1 of the adjacent coulter.
- Put the caps 2 on the coulter to be remove 1.
