Calibrating the metering unit
REQUIREMENTS
The hopper is at least one quarter filled with spreading material
To unlock the calibration bucket,
remove the linch pin 1 from the holder.
- Take the calibration bucket 1 out of the holder.
- Slide the calibration bucket 2 into the guide rails 1 so that the calibration bucket is positioned underneath the metering unit.
- Open the calibration flap 1.
To start the calibration via the TwinTerminal 1 or the calibration button:
Refer to the ISOBUS software operating manual, Calibration menu
or
refer to the Control computer operating manual.
To start the calibration via the control terminal:
Refer to the ISOBUS software operating manual, Calibration menu
or
refer to the Control computer operating manual.
- Take the collapsible bucket 1 and calibration scale 2 out of the mount.
- Fold down the bracket 1 on the ascent.
- Hang the scale 2 on the bracket 1 on the ascent.
- Hang the collapsible bucket 3 on the scale.
- Close the calibration flap 1.
- Take the calibration bucket 2 from the guide rails 1.
- Pour the seed from the calibration bucket into the collapsible bucket.
If the implement is equipped with a two-chamber hopper,
also calibrate the metering unit for the second hopper tip.
- Put the calibration bucket 1 in the parking position.
To lock the calibration bucket:
attach the linch pin 1 onto the holder.
