Placing the metering unit in service
When the hopper is full:
Pull the sliding shutter 2 out of the metering housing.- Park the sliding shutter on the metering unit housing.
- Pivot the bolts 1 in front of the sliding shutter.
- Tighten bolts with the wrench 3.
If work is started without calibration:
Close the calibration flap 2.- Lock the closing lever 1 on the metering unit housing.
Depending on the implement equipment,
Close the calibration flap on the second conveyor section 3.
