Using the implement

REQUIREMENTS

  • The implement is unfolded

  • The parallelograms required for hoeing operation have been selected and moved into working position

  • The implement is set up and adjusted for operation

  • The implement is raised

  1. If the headland is straight:

    Drive into the field with the tractor until the parallelograms have reached the beginning of the plant rows

or

If the headland is slanted:

Drive into the field with the tractor until one of the two outermost parallelograms has reached the beginning of a plant row.

  1. Lower the implement on the field with the three-point power lift until the support wheels are resting on the ground.
NOTE

If the load on the support wheels is too high, the support wheels sink in.

  1. Use the three-point power lift to distribute the load on the tractor lower link and the support wheels.
  2. Drive off with the tractor.