Moving the EKP-M into working position

  1. Swivel down the lever 2 for locking on the ball head 1.
  1. Lift up the parallelogram 4 with the hand lever 1 until the locking bar 3 disengages and the tension spring 2 releases it from the parallelogram 4.
  1. Lower the parallelogram 2 all the way down with the hand lever 1.
  2. Move all of the parallelograms required for hoeing operation into working position in the same way.