Starting the spreading procedure
- Lift the machine to working height.
To activate the oil circuit:
Actuate the red tractor control unit.
or
Run the universal joint shaft at low tractor engine speed.
- Switch on the control terminal.
- In the Field menu, select Work.
NOTE
If the Work menu is exited while working, the system will automatically return to the Work menu after 10 seconds.
- Drive onto the field.
- If necessary, change the target rate in the Field menu.
To run the spreading discs:
Press . Then confirm with .
or
Run the universal joint shaft at low tractor engine speed.
Universal joint shaft speed | Spreading disc speed |
|---|---|
3751/min | 5001/min |
4151/min | 5501/min |
4501/min | 6001/min |
5401/min | 7201/min |
6001/min | 8001/min |
6751/min | 9001/min |
7501/min | 1.0001/min |
- Press at the switch-on point
or
Open the left shutter or the right shutter
or
To switch the shutters automatically:
Switch on Section Control.- 1
Shutter closed
- 2
Shutter open
When the spreading procedure starts after longer road transport with a full spreader hopper:
Ensure correct spreading.To start boundary spreading:
Switch on the boundary spreading system. Drive around the field.- Switch off the boundary spreading system after boundary spreading.
