Checking the bolted connections

Interval

  • After initial operation

  • all 50 Operating hours

    or

    Weekly

CAUTION
Risk due to loosening of the bolted connections
After a short period of operation, the bolted connections lose preload force and can become loose.
Tighten the bolts once after 2 hours and then according to the specifications on the sticker.
  1. Check all bolts on the plough for tight fit.
  1. Check all bolts on the plough body as specified for tight fit.

1

M12x35 12.9

2

M10x35 12.9

3

M12x40 12.9

4

M14x39 12.9