Preparing the central overload safetyWARNINGRisk of injury due to components under high pressure being thrownOpen the bolted connection on the hydraulic accumulator up to a maximum of 180°.Put the hand lever on the hydraulic accumulator.Open the hydraulic accumulator with the hand lever.Then fasten the hand lever in parking position with the spring cotter pin.