Inspecting the field sprayer

The machine is subject to the European Union universally applicable regular field sprayer inspections (Crop Protection Directive 2009/128/EC and EN ISO 16122).

The date for performing the next inspection is written on the test badge on the machine.

The field sprayer inspection must be performed at the latest 6 months after initial operation and must be repeated every 2 years.

  • Have the field sprayer inspected at regular intervals by a recognised and certified inspection workshop.