The boom does not fold into transport position.
The wiring harness is defective.
NOTE
With Flex-folding, the boom sections can be manually folded on the hydraulic blocks from the to the inside if the wiring harness is defective.
Assignment of the hydraulic blocks:
Hydraulic block 2 is for the first and second sections from the outside.
Hydraulic block 1 is for the third section from the outside.
- Switch on the ISOBUS control terminal.
- Press and hold the pushbuttons on both solenoids a until the outer boom section is folded.
- Press and hold the pushbuttons on both solenoids b until the second boom section from the outside is folded.
- Press and hold the pushbuttons on both solenoids c until the third boom section from the outside is folded.