Using the implement
Back
  • Spreading fine seed
  • Extending the telescopic axle
  • Unfolding implement sections
  • Filling the fertilizer hopper
  • Filling the Central Seed Supply hopper
  • Filling the auxiliary seed hopper
  • Align rear frame parallel to the ground
  • Using the Comfort hydraulic system with ISOBUS
  • Using the implement
  • Performing maintenance tasks during operation
  • Checking the placement depth
  • Checking the grain spacing
  • Using the multi-placement tester
  • Using the shifted tramline
  • Turning on headlands
  • Emptying the conveyor section
  • Discharging and cleaning the metering unit
  1. OP. MAN. Precea 9000, 12000; -T, -TCC
  2. Using the implement
  3. Performing maintenance tasks during operation

Performing maintenance tasks during operation

In operation with high levels of organic residue on the field, the fan intake opening must be cleaned at regular intervals.

  • To clean the suction guard screen:

    Cleaning the suction guard screen

or

To clean the cyclone separator:

Cleaning the cyclone separator.