Cleaning the conveyor section
Interval
At end of season
- Unlock all closing levers 2 on the metering unit housing.
To prevent moisture from accumulating:
Open all calibration flaps 1.

- Unscrew the knurled screws 4.
- Take off the cover 1.
To remove the deposits:
Aim a water jet into the seed outlets 3 and into the corrugated tube 2.- Mount the cover.
- Tighten the knurled screws hand tight.
- Close all calibration flaps.
To dry the conveyor section:
Switch on the fan for 5 minutes.
