Emptying the conveyor section
PREREQUISITES
Implement must be in working position
The implement is in motion
When the implement moves into the headland, all flaps 1 in the segment distributor head close. The remaining spreading material is kept in motion by the return flow 2. When work ends the conveyor section must be emptied.
To empty the conveyor section:
Pre-stop the metering unit shortly before the end of the last track.
