Emptying the conveyor section

PREREQUISITES

  • Implement must be in working position

  • The implement is in motion

When the implement moves into the headland, all flaps 1 in the segment distributor head close. The remaining spreading material is kept in motion by the return flow 2. When work ends the conveyor section must be emptied.

  • To empty the conveyor section:

    Pre-stop the metering unit shortly before the end of the last track.