Jump to main content
myAMAZONE
OP. MAN. Precea 9000, 12000; -T, -TCC
Search
Index
Preparing the implement
Back
Checking tractor suitability
Coupling the implement
Preparing the implement for use
Mounting the battery
Aligning the implement horizontally
Preparing the implement sections for rigid operation
Preparing the metering unit for operation
Repositioning the fill level sensor
Operating the loading board
Pulling out and sliding in the ladder
Opening and closing the hopper cover
Setting up the speed sensor of the implement
Filling the hand wash tank
Preparing the corrugated disk tractor wheel mark eradicator for use
Preparing the micropellet spreader for operation
Determining the seed settings
Adjusting the Central Seed Supply System
Adjusting the air supply of the fertilizer metering unit
Setting the singling pressure with the tractor control unit
Adjusting the singling pressure with the slide-on pump
Setting the target pressure differential for Central Seed Supply and fertilizer
Adjusting the shifted tramline
Adjusting the placement depth on the coupled fertilizer coulter
Adjusting the PreTeC mulch seeding coulter
Adjusting the grain singling unit
Adjusting the pressure of the implement sections
Adjusting the spread rate for seed
Adjusting the application rate for fertilizer
Placing the metering unit in service
Calibrating the spread rate
Preparing the FertiSpot for use
Adjusting track width
Preparing the implement for road travel
OP. MAN. Precea 9000, 12000; -T, -TCC
Preparing the implement
Preparing the implement for use
Adjusting the application rate for fertilizer
Adjusting the application rate for fertilizer
Placing the metering unit in service
Calibrating the spread rate