Filling the Central Seed Supply hopper
PREREQUISITES
Implement is coupled on the tractor.
When working in the dark, the hopper interior lighting is switched on.
All fans are switched off.
- Secure tractor and implement.
- Swing down the ladder.
- Swing up the loading board.
IMPORTANT
- Unlock the lock lever 1.
- Open the hopper cover 2.
The grain shape or the dressing can cause the seed to be poorly conveyed.
If seed remains on the sieves 1 during the filling procedure:
Mix 17,64 oz (500g) of talcum at 40 units per 50,000 grains to improve the sliding capacity of the seed.
WARNING
- Fill the central seed hopper.
Clean the cover seal and the sealing surface.
- Close the hopper cover 2.
- Swing up the ladder.
- Fold the loading board.
