Preparing the implement for parking

PREREQUISITES

  • Hopper covers closed

  • Control terminal switched off

  1. To prevent moisture from accumulating:

    Park the implement on a level surface with a solid substrate.
  2. For a longer period of decommissioning:

    Open the calibration flaps and emptying flaps.

Accumulating condensation can drain-off.