Preparing the implement for parking
PREREQUISITES
Hopper covers closed
Control terminal switched off
To prevent moisture from accumulating:
Park the implement on a level surface with a solid substrate.For a longer period of decommissioning:
Open the calibration flaps and emptying flaps.
Accumulating condensation can drain-off.
