Changing the metering roller
NOTE
- Select a suitable metering roller depending on the spreading material and metering rate. If the spreading material is not listed, select the metering roller for a spreading material with a comparable grain size, see Selecting the metering roller.
When the hopper chamber is filled:
Insert the shutter to separate the metering unit from the hopper, see Inserting the shutter.
- Unlock the locking lever 1 on the metering housing.
- Open the calibration flap 2.
- Take the calibration bucket 1 from the storage compartment.
- Push the calibration bucket into the holder 2 under the metering housing.
To empty the metering unit and the metering roller:
Refer to the ISOBUS software operating manual, Emptying.
- Switch off the control terminal and disconnect the power supply between the tractor and the implement.
- Using the spanner 1, loosen the bolts 2.
- Turn the bearing cover 3 in the direction of the arrow.
- Remove the bearing cover.
- Check the sealing ring of the bearing cover for damage.
If the sealing ring is damaged:
replace it.- Take out the inserted metering roller.
When installing metering rollers with blind wheels, make sure that the stoppers 2 are facing the groove 1.
- Install the metering roller 3.
- Install the bearing cover.
To fasten the bearing cover:
Turn the bearing cover counterclockwise.- Tighten the bolts with the wrench.
If the shutter was inserted at the beginning:
Take out the shutter and fix it in parking position.- Empty the calibration bucket and stow it in the storage compartment.
- Close the calibration flap 2.
- Lock the locking lever 1 on the metering housing.
