Cleaning the conveyor section

Interval

  • At the end of the season

  1. Unlock all locking levers 2 on the metering housing.
  2. To prevent the accumulation of moisture:

    open all of the calibration flaps 1.
  1. Loosen the knurled screws 4.
  2. Remove the cover 1.
  3. To remove the deposits:

    Aim a water jet into the seed outlets 3 and into the corrugated tube 2.
  4. Install the cover.
  5. Tighten the knurled screws by hand.
  6. Close all of the calibration flaps.
  7. To dry the conveyor section:

    Switch on the fan for 5 minutes.