Checking and adjusting the metering lips
Interval
At the beginning of the season
REQUIREMENTS
Metering unit is cleaned
- Loosen the nuts of the eyebolts 3 with the spanner 1.
- Swivel the eyebolts to the side.
- Take the sliding shutter 2 out of the holder. Slide it into the metering unit housing 4 up to the stop.
- Loosen the bolts 1 with the spanner 2.
Remove the metering lip holder 3.
Check the metering lip 5.
If the chamfer 1 is wider than 2mm:
Turn the metering lip
or
If the metering lip is worn on both sides:
Replace the metering lip.
Adjust the distance A of the metering lip parallel to the metering lip holder 4 to 24mm.
Tighten the bolts 2.
Check the seal 3.
If the seal is damaged:
Replace the seal.
Install the metering lip holder 3.
- Tighten the bolts 1 with the spanner 2.
- Park the sliding shutter 1 in the metering unit housing.
- Swivel the eyebolts in front of the sliding shutter.
- Tighten the nuts of the eyebolts 2 with the spanner 3.
- Park the spanner in the holder.