Calibrating the metering unit
To select the correct bottom flap position for the calibration:
Read the bottom flap position from the table 1 and move the lever 2 to the desired position.
- Pull out the calibration trough 1.
To collect the seed in the calibration trough 1:
Turn the calibration trough with the opening facing up.
- Retract the calibration trough 1.
To guide the seed into the calibration trough:
Move the calibration lever 1 beyond the latch to the end position.- Push the calibration lever back and let it engage in the calibration position.
- Read the volume of the metering wheels from table 2.
To start the calibration via the calibration button 1 or the TwinTerminal:
Refer to the ISOBUS software operating manual, Calibration menu
or
refer to the Control computer operating manual.
To start the calibration via the control terminal:
Refer to the ISOBUS software operating manual, Calibration menu
or
refer to the Control computer operating manual.
- Fold down the bracket 1 on the ascent.
- Take the scale 2 and collapsible bucket 1 from the SmartCenter.
- Hang the scale 2 on the bracket 1 on the ascent.
To weigh the collected seed from the calibration trough:
Hang the collapsible bucket 3 on the scale and pour in the seed.
The desired seed rate is generally not achieved with the first calibration. The achieve the desired seed rate, the calibration must be repeated several times.
To enter the weight of the collected seed on the TwinTerminal, control terminal or control computer:
Refer to the ISOBUS software operating manual, Calibration menu
or
refer to the Control computer operating manual.
