Installing the seed guide elements

Depending on the implement version, 4 or 6 seed guide elements 1 are required for the hopper.

  1. Open the hopper cover.
  1. Release the locking mechanism 1 with the universal operating tool 2.
  1. Push the locking plate 1 to the side.

The charging sieves can be opened.

  1. Fold up the charging sieve 1.
  1. Position the seed guide elements 1 in the hopper.
  1. Fold down the charging sieve 1.
  2. close the hopper cover.