Emptying the hopper and metering unit
To pull out the calibration trough:
Fold down the bracket 1.
- Pull out the calibration trough 1.
To be able to collect the seed in the calibration trough 1:
Turn the calibration trough with the opening facing up.
- Slide in the calibration trough 1.
- Move the bottom flap lever 2 to the position from the last seeding operation.
To guide the seed into the calibration trough:
Move the calibration lever 1 beyond the latch to the end position.
The flag 3 indicates that the calibration lever 1 is in the correct position.
- Push the calibration lever back and let it engage in the calibration position.
- Completely open both sliding shutters 1 on the metering units.
To empty the hopper:
Move the bottom flap lever 1 to the end position.
IMPORTANT
To interrupt the emptying procedure:
Move the bottom flap lever to the position from the last seeding operation.
- Put the universal operating tool 1 on the adjustment spindle 2.
To empty the metering wheels:
Turn the universal operating tool counterclockwise 1
or
To start emptying via the calibration button or the TwinTerminal:
Refer to the ISOBUS software operating manual, Emptying menu.To remove seed remaining in the metering housing 1:
Move the bottom flap lever in both directions several times.
When the bottom flaps are correctly set, the bolts of the metering housing are lined up.
If a bolt on the metering housing deviates from the line,
correct the bottom flap setting, see section Checking the basic setting of the bottom flaps.
- Pull out the calibration trough 1.
- Empty the calibration trough.
- Slide in the calibration trough 1.
