Jump to main content
myAMAZONE
Operating Manual - KE 4002-2, 4502-2, 5002-2, 6002-2; -300; 6002-2-400
Search
Index
Preparing the machine
Back
Calculating the required tractor characteristics
Attaching the backstop profiles for the lower links
Using the centre line eradicator
Installing the universal joint shaft on the machine
Coupling the implement
Preparing the implement for operation
Preparing the machine for road travel
Operating Manual - KE 4002-2, 4502-2, 5002-2, 6002-2; -300; 6002-2-400
Preparing the machine
Preparing the machine
Calculating the required tractor characteristics
Attaching the backstop profiles for the lower links
Using the centre line eradicator
Installing the universal joint shaft on the machine
Coupling the implement
Driving the tractor towards the implement
Coupling the three-point extension
Coupling the three-point mounting frame
Coupling the hydraulic hose lines
Coupling the lighting for road travel
Coupling the universal joint shaft
Calculating the permissible payload
Coupling the power supply for additional fan
Preparing the implement for operation
Adjusting the speed of the tines
Manual adjustment of the tine working depth
Hydraulic adjustment of the tine working depth
Adjusting the working height of the levelling board
Adjusting the working depth of the side guide plates
Preparing the track marker for operation
Preparing the wheel mark eradicator for operation
Adjusting the spring tension of the side guide plates
Adjusting the scraper on the roller
Preparing the machine for road travel
Lifting the leaf spring-guided wheel mark eradicator
Folding the machine
Switching off the work lights