Checking the FertiSpot conveyor rotor
Interval
At end of season
PREREQUISITES
The machine must be mounted on the tractor
Fan must be switched off
Filling auger is switched off
Disconnect the energy supply from the metering unit housing 1.
Remove the cotter pin 2.
Dismount the air separator 2.
Unscrew the knurled nut 1.
Open the cover for spot placement 1.
If the sheet metal edge on the conveyor rotor 1 has taken on the shape of radius:
Replace the conveyor rotor as follows:
- Dismount nut 1.
Replace the rotor 2.
- Clean the cover and metering unit housing with a soft brush.
- Mount nuts.
NOTE
Close the cover of the metering unit housing.
Tighten the knurled nut.
Mount the air separator.
Mount the cotter pin.
Mount the energy supply on the metering unit housing.
NOTE
Lift out the machine.
On all coupled coulters, set the placement depth to position 6.
- In the menu Settings > Info > Diagnostics, select > Rows.
- Activate .
