Installation recommendation

Installation recommendation

Conversion

Hydraulic coulter pressure system

Mechanical coulter pressure system

From 4 to 6 rows

Rows 2 and 5

Rows 2 and 5

From 8 to 12 rows

Rows 3, 5, 8 and 10

Rows 2, 5, 8 and 11

NOTE
Depending on the conversion that is performed, new supply hoses for air supply and/or fertiliser supply are required.
  1. To ensure optimal hose routing:

    Refer to the table above for the rows that must be installed

or

If conversion options that are not listed should be carried out:

Have the desired conversion options checked by a specialist workshop.
  1. Unfold the machine sections.
NOTE
Alternatively, the rows to be installed can be determined on the control terminal.
  1. In the Settings menu, select Machine > Geometry.
  2. Enter the desired number of rows under Installed rows.

If the number of rows is changed, the displayed diagram shows the arrangement of the rows on the distributor head.