Using the implement

  1. Lower the implement until it is just above the field.

For tasks with the implement switched on, ensure that the tines touch the ground.

  1. Switch on the tractor PTO shaft.
  2. Lower the implement onto the field.
  3. Bring the hydraulics of the 3-point power lift into float position.