Emptying the metering unit and hopper of the micropellet spreader
To open the calibration flap 2:
Open the quick-release fastener 1.
To take the deflector plate 1 out of the holder:
Turn the deflector plate up until it can be guided through the slot 2.
To take the calibration flap 2 out of the holder:
Turn the calibration flap up until it can be guided through the slot 1.
- Attach the deflector plate 2 on the opening 1 of the tube.
The deflector plate 1 is in the calibration position.
If you only want to emtpy the metering unit, the sliding shutter must be inserted in the metering unit housing.
- Loosen the nuts 2 with the socket wrench 1.
- Swivel the bolts to the side.
- Take the sliding shutter 3 from its parking position.
- Push the sliding shutter 2 into the metering unit housing.
- Park the socket wrench in the holder 1.
The design of the calibration bucket can vary depending on the implement equipment.
- Take the calibration bucket 1 from the mount on the implement.
- Place the calibration bucket under the deflector plate.
To start the metering unit:
Press the calibration button
or
Start the metering unit using the ISOBUS software.
- Empty the calibration bucket.
- repeat the procedure.
