Folding implement sections

The implement is folded via the control terminal.

  1. In the Field menu, select Hydraulic system > Folding

or

see the ISOBUS software operating manual.

  1. Activate the tractor control unit green 2.

The implement frame is lifted out.

The coulters are lifted out.

When the implement frame reaches the headland position, the wheel mark eradicator is folded.

When the implement frame is folded, the implement sections are then folded.

  1. To maintain the transport height of 13,12 ft (4m):

    Set the lower links to the desired height.