Placing the metering unit in service
When the hopper is full:
Pull the sliding shutter 1 out of the metering housing.- Park the sliding shutter on the metering unit housing.
- Pivot the bolts 2 in front of the sliding shutter.
- Tighten bolts with the wrench 3.
If work is started without calibration:
Close the calibration flap 1.- Close the locking lever 2.
