Placing the metering unit in service

  1. When the hopper is full:

    Pull the sliding shutter 1 out of the metering housing.
  2. Park the sliding shutter on the metering unit housing.
  3. Pivot the bolts 2 in front of the sliding shutter.
  4. Tighten bolts with the wrench 3.
  1. If work is started without calibration:

    Close the calibration flap 1.
  2. Close the locking lever 2.