Filling the spray liquid tank through the pressure connection

IMPORTANT
Implement damage due to lime deposits (calcification)
High degrees of water hardness above 15° dH (German degrees of hardness) can cause calcification.
At water hardness greater than 15° dH (German water hardness), use polyphosphate-based hardness stabilizers.
Follow the manufacturer's instructions for the hardness stabilizers.
IMPORTANT
Implement damage due to excessively high water pressure
Maintain a maximum water pressure of 116,03 psi (8bar).

If the filling capacity is greater than 264,17 gpm (1.000l/min):

Keep the cover of the spray liquid tank open during the filling procedure.
NOTE
To ensure that the permissible payload is not exceeded, take into account the different specific weights [kg/l] for the various liquids when filling your field sprayer.

Specific weights of different liquids

Liquid

Water

Urea

AHL

NP solution

Density

8,35 lb/gal (1kg/l)

9,26 lb/gal (1,11kg/l)

10,68 lb/gal (1,28kg/l)

11,52 lb/gal (1,38kg/l)

  1. Couple a suitable pressure hose on the pressure connection and on the hydrant.
  2. Open the stop tap on the pressure connection.

Filling starts.

  1. During the filling procedure, add the spray agent.
  2. Monitor the fill level via the fill level indicator.
  1. When the desired fill level is reached:

    Close the stop tap.
  2. Uncouple the pressure hose.