Spraying

  1. Switch on the control terminal.
  2. Enter the rate in the Field menu on the control terminal.
  3. Run the spray liquid pump at operating speed.
  4. Select for pressure valve chest DA.
  5. Select on the TwinTerminal and confirm.
  6. Select on the TwinTerminal, set the agitator capacity and confirm.
  1. Switch on spraying operation in the Work menu on the control terminal.